Electricity Contract - EVN - Electricity Vietnam


Article 1. power purchases
1.1. The location, purpose of use, the connected power supply, start time, power quality, power output, use has been recorded in detail in Appendix I of this contract
1.2. Secondary load chart, listing the devices used and the specification of the equipment or production line are recorded in annex II of this agreement.

Article 2. Power Measurement
2.1. Energy metering equipment are detailed in Appendix I of this contract.
2.2. Record indicator of power electronic monthly: base power output registers used by the buyer, the seller your implementation time and counts scoring only number thermometers counting power given in Appendix I of this contract;

Article 3. Power purchase prices and payment methods
3.1 The purchase price of electricity: To comply with current regulations of the State. Based on the intended use of the buyer power of registration, the seller records the percentage of each use with a written agreement rate of electricity use are listed in Appendix I of this contract .

In the process of using electric power buyers can change the use of electricity for the purpose of changing electricity prices must notify The Seller 15 days to adjust the subjects of the contract price. Minutes of the agreement rate using electrical purposes together in Appendix II of this contract.
When a change in state electricity prices, the Parties shall apply the new tariff and do not necessarily have to sign the contract

3.2. Method of payment of electricity:
a. Currency: Vietnamese Dong (VND)
b. Terms of payment corresponding to the period of recording galvanometer of the month.
c. Method: bank transfer
d. Location cashing in ....
Within 05 days after receiving notice of payment of electricity seller, the buyer shall pay the full amount of the invoice was issued. Beyond that date without payment, the buyer must pay an additional late payment of money, with the highest interest rates of bank account The Seller is stated in the contract at the time of payment and multiply number of days delayed payment to the date of payment until the buyer paid. When the seller has notified three times the buyer has not paid, after fifteen days from the date of notification for the first time, the seller may stop providing power
The electricity sellers will announce the suspension of power supply 24 hours in advance and is not responsible for damage caused the suspension. The power supply back only carried out after the buyer has fully paid for electricity, interest on delayed payment and all expenses related to the suspension and resumption of power supply

Article 4. Force Majeure
4.1. events of force majeure: the event, circumstance or combination of events or situations described below to prevent the whole or part, which causes a delay in the implementation of its obligations under this contract, but only when the ncác event or situation that satisfies all the following conditions: Happening objectively not anticipated, outside control of the affected Party; Not at fault or the obstruction of the affected Party; Not be avoided whether Parties affected have been attempts to apply the remedy required.
Force Majeure includes:
a. Natural disasters including typhoons, earthquakes, lightning higher levels, the frequency or design, fire, drought, flooding, water pollution or other natural phenomena directly affect the electricity supply electricity seller and the buyer receives electrical power
b. War, armed conflict, embargo, riot, rebellion, terrorism or sabotage;
c. Epidemic, strike, strike, public Wheelchairs, clearance or activities ceased work through no fault of either party to the cause
d. A third party caused power failures that The Seller can not anticipate or can not be controlled.
4.2. Consequences of Force Majeure:
No party shall be liable or deemed in violation of treated or there was an error due to exercise or delay in complying with its obligations under the contract (excluding payment obligations) when the unforeseen happens.
Any of the obligations of each party arose before force majeure shall not be waived except by the force majeure.
4.3. Notification and overcome unforeseen events.
Party affected by force majeure shall inform the other of events, situations constitute force majeure as soon as possible but no later than three (03) days after the communication is ready to recovery. Notice of force majeure, including full details of events, situations constitute force majeure, its impact with affected parties for the performance of contractual obligations and propose remedies
Affected parties will be maximum effort to overcome the consequences of force majeure so that the supply and use is again the fastest. Affected parties to provide regular reports to the other party for implementation of remedial measures to prevent or mitigate the effects of force majeure and other information requested by the other Party a reasonable

Article 5. Rights and obligations of the Parties to sell electricity
5.1. The right of the seller
5.1.1. Entered the area of buyer power management to operate, maintenance repair and replacement of electric equipment of electricity sellers; test; recording of meter and contact the buyer
5.1.2. Periodic inspection and immediate implementation of the terms stated in this contract;
5.1.3. The seller of electricity stops, reduce the supply of emergency power in the following cases:
a. due to incidents occurring in power system
b. Risk incidents, serious unsafe for people, equipment and electrical systems,
c. Due to lack of capacity to threaten the safety of electrical systems.
d. Third Party violates the corridor grid caused incidents that seller can not control
e. Due to unforeseen events.
Within 24 hours of electricity buyer will be notified by phone or email, or fax, or text or through the website: www.hcmpc.evn.com.vn or the mass media buyer power further explanation, expected duration of power supply again
5.1.4. The seller of electricity to stop, reduce non-emergency power supply in the following cases:
a. Stop or decrease power supply according to the plan of the electricity seller when there is demand for repair, maintenance, overhaul, construction and installation of electrical works, air conditioning, limit load due to lack of electricity and other needs as plan
b. stop the power supply at the request of the organizations and individuals involved in these cases to ensure safe service of construction works
c. Stop, reduce the supply of electricity at the request of the buyer.
Before making the seller notifies the buyer that before the suspension or reduction of the power supply at least five days in the form: Notification by phone or by fax, or in writing, or through website: www.hcmpc.evn.com.vn or the mass media
The power supply back to the cases mentioned at Point c is only conducted after the buyer has fully paid for the electricity costs associated with the suspension and resumption of power supply
5.1.5. Seller electric power supply stopped when buyers of legal provisions of the legislation on electricity activities and electricity use, in the following cases:
a. Vandalism of electric equipment, power metering equipment and the electricity works.
b. Violation of safety regulations on electrical transmission, distribution and use. Violation of regulations on the protection of the power grid safety corridor, the safe distance of transmission lines and power stations, not to ensure equipment using electrical equipment connected to meet the technical standards and requirements electrical safety requirements for connection to the national grid.
c. Obstructing inspection of electricity activities and electricity use
d. Electricity theft in any form
e. Using electricity to trap, capture animals or use as a means of protection, except as provided for in Article 59 of the Electricity Law
f. Failing to comply with regulations on payment of electricity and other agreement in this contract.
g. Do not use electrical safety, savings and efficiency, do not implement the regulation on the management of demand for power users
h. As required for state agencies competent to sanction administrative violations in the electricity sector.
i. Failing to use the power required by units of the power system.
The seller will notify by mobile phone, or by fax, or text or through the website: www.hcmpc.evn.com.vn or on mass media for the buyer 24 hours prior to the suspension power. Particularly point d above, the seller made the suspension shall immediately, then report to the State management agency on electricity activities and electricity use at the local said
The sale of electricity back to only proceed after the buyer has made commitments under this contract or the handling decisions of state agencies have jurisdiction and the buyer has paid for all electricity sellers costs related to the suspension and resumption of power supply
5.1.7. Other rights prescribed by law
5.2. The Seller's obligations
5.2.1. the maximum effort to provide sufficient capacity, power output meets the standards of technical quality of electrical burn in Appendix I of this agreement, unless the system overloaded as confirmation of bodies regulate electrical power;
5.2.2. the right to sell electricity at a price specified items in Appendix I of this agreement. 5.2.3. troubleshooting system;
5.2.4. to restore the power supply shall be 2 hours since the discovery of the incident, or receiving notice of the buyer; the case is not made within the above they must inform the buyer power on the cause and expected time of return to power.
5.2.5. to comply with legal process, to operate the grid; the method of operation, command, control of the unit of power;
5.2.6. implementing national management needs using electricity;
5.2.7. provide information regarding the use of power saving efficiency.
5.2.8. compensation for damages to the buyer electronically damage directly due to the subjectivity of power caused the seller, unless due to unforeseen events;
5.2.9. other obligations prescribed by law.

Article 6. The electricity sellers committed to compensation and penalties for breach of contract in the following cases:
6.1. delay the power supply according to the time limit agreed in the contract of purchase and sale of electricity has concluded, except in case of fault of the buyer or the buyer has written request or encounter unforeseen events.
6.1.1. compensation to the buyer power in terms of direct damage that buyer power suffered due to violations perpetrated;
6.1.2. penalties: in 8% of the value of the contractual obligations are violated. Method of determining the value of the obligation breached contracts are recorded in point 1 of the Appendix III of this agreement;
6.2. Sold electricity does not warrant the quality, not enough power according to contracts signed cause damage to the buyer, unless unforeseen events 6.2.1. Compensation to the buyer electronically using the value of direct damage that buyer power suffered due to violations of the right to sell electricity;
6.2.2. penalties: in 8% of the value of the contractual obligations are violated. The value of contractual obligations are violated as determined by the formula referred to in point 2 of the Appendix III of this agreement
6.3. writing the next mistake, wrong billing calculations for buyer power: power seller must reimburse the buyer the amount of power was overpaid plus interest calculated by the amount to be repaid with interest loans of the Bank. The buyer has the account stated in the contract at the time of billing return multiplied by the number on collecting scraps of buyer power surplus to pay the seller refund excess electricity to the buyer;
6.4. the wrong price of electricity Sold by the State regulations: on the sale of electricity to reimburse the buyer power of money has overpaid plus interest calculated by the amount to be repaid with interest nhâqn suât loans of Bank buyer power is recorded in the accounts at the time treated as a billed repaid multiplied by the number on collecting scraps of buyer power pay inheritance cash advances up to date on the sale of surplus electricity refund to the buyer; The case is not well defined in time to apply the wrong price will be charged with espionage is 12 months from the time of discovery onwards;
6.5. violation of the agreement to other electricity purchases were handled in accordance with the rules of the methodology of law

Article 7. Rights and obligations of the buyer power
7.1. rights of buyer power
7.1.1. Provided sufficient capacity, power, power quality assurance was agreed in the contract. 7.1.2. require the seller promptly to restore the power supply power after losing power 7.1.3. Offered or recommended information related to the purchase and sale of electricity and electrical safety;
7.1.4. The compensation for damage caused by the seller your cause as defined by law
7.1.5. Ask the seller electric check electrical service quality; accuracy of measurement count, the amount of your payment;
7.1.6. complaints, accusations of violations of the law on electrical activity of the party selling electric
7.1.7. Other rights as defined by law
7.2. Obligations of the buyer
7.2.1. using proper purpose the right capacity, electricity agreement in Appendix I of this contract;
7.2.2. payment of electricity bills in full, on time and the revenues arising under other agreements in the contract of purchase and sale of electricity;
7.2.3. use electrical safety, savings and efficiency; implementation of the regulations on the management of the power user needs;
7.2.4. reduce electricity consumption or cut your timely receipt of the notice by the seller in the cases stipulated in point 5.1.3; 5.1.4; 5.1.5 clause 5.1 article 5 of this agreement;
7.2.5. to notify the seller power known in the day when there is a need to pause use, before fifteen days when demand termination of the purchase and sale of electricity;
7.2.6. timely notice to the sale of electricity when the extraordinary phenomena can cause loss of power, loss of security for persons and property;
7.2.7. creating conditions for the seller Office inspecting the implementation of the contract, scoring only number and contact address needs related to the purchase and sale of electricity; 7.2.8. ensure that the equipment used to meet the technical standards and safety requirements;
7.2.9. compensation where damage to the selling power as required by law;
7.2.10. implementation modes using electricity at the request of the unit of power, measures ensuring standard voltage, safety and other contents have been agreed in the contract;
7.2.11. equipped with systems that convert power from the national grid to get from other sources of standby power as required by law, to ensure the important work normally or not be damaged in case of loss of the national grid.
7.2.12. other obligations as defined by law.

Article 8. Electricity buyers committed to compensation and penalties in the following cases:
8.1. delayed the implementation of contracts concluded unless the fault of the seller or the seller has written request or encounter unforeseen events.
8.1.1 indemnity seller power in terms of direct damage that seller power suffered due to violations perpetrated;
8.1.2. level of the fine by 10% in value of the obligation breached contract method to determine the value of the obligation breached contracts are recorded in ddiểm 3 Appendix III of this agreement
8.2. Use power for improper purposes are priced higher than the price agreed in the contract.
8.2.1. compensation for power by the seller funds spread in violation of the purpose of use plus interest to be calculated by the sum of variances price multiplied by the interest rate for loans to the Bank's highest seller with the account given in the contract at the time of the payment multiplied by the number of days of using the wrong goal to date thnh Math. The case is not well defined point in violation of the purposes of use have high price will be charged with time is 12 months from the time of discovery onwards;
8.2.2. fines equal to 8% in value of compensation.
8.3. use the power in peak hours agreement stated in Appendix I of this agreement.
8.3.1. buyer power to indemnify the damage to the seller in case of damage to the selling power
8.3.2. The penalty is equal to 8% in value of the obligation breached contract
Worth contracts violated as determined according to the formula stated in annex III, point 4 of this agreement
8.4. no cut or reduce power consumption in a timely manner upon receipt of notice of the seller in the cases stipulated in point 5.1.3; 5.1.4; 5.1.5 clause 5.1 article 5 of this contract the buyer power to
8.4.1 compensation to the seller in case of damage to the selling power
8.4.2. Penalties: buyer power deliberately breach the seller was entitled to stop the power supply until the buyer has written commitment of the Executive power or reduce the consumption of electricity, at the same time be paid enough to sell your fines in violation of the contract and the costs associated with the stop and power back on.
8.5. Causing trouble for the grid, damaging the equipment seller power
8.5.1. Compensation for selling electricity by direct damage that power must be subject to the seller and the outright sale of power which should be enjoyed without violation of buyer power, on the basis of agreement between two parties;
8.5.2. fines equal to 8% in value of compensation
8.6. Fraud in the use of any form
8.6.1 Shall compensate for damage to the electricity sold by the value of electricity lost due to fraud.
8.6.2. fines equal to 8% in value of compensation
method to determine power compensation and indemnification in respect of the acts it writes in point 5 of the Appendix III to this agreement
8.7. in the period of the system measured counts your lost, or broken, or cease operations should be measured counts are incorrect, or the next not true or false bills caused by damage to the seller: buyer power must pay the seller the amount of electric charge. Methods defined mobile computer missing items in point 6 of the Appendix III of this agreement
8.8. The other dealt with glass under the rule of law.

Article 9. Method of payment of compensation and fines
9.1. while waiting for the results solve disputes breach of contract by the authority, buyer power still have to pay for your seller the amount of power generated monthly under the Bill has released (if any)
9.2. Time limit for payment of compensation; fines: within 15 days of acceptance of the claim for damage, fines, on the violation shall be responsible for payment of amount accepted for parties violated. The time limit on that unpaid shall:
9.2.1. If the buyer was compensation and punishment shall have the right to delay paying electricity within the next month until the full amount of compensation, which is fine, the buyer shall not be processed due to the slow pay is equal to the amount of the fine. If the seller had to pay to the buyer power amount to restitution, fines (if any), the buyer must pay the electricity right to the sale of electric power amount withheld, so deadlines 3 days that buyer power is not paid, the buyer must pay the extra power all interest payments deferred payable to the seller. Interest is calculated by the amount of deferred pay multiplied by the interest rate of loans to the Bank's highest seller with the account given in this contract at the time of payment and multiplied by the number on pay from the date on the purchase of a qualifying amount of electricity on the wholesale electric power to the buyer for payment. After fifteen days from the date the buyer power got enough money that buyer power is still not paid, the seller has the right to stop providing power. The seller power would notice the time stopped issuing your first 24 hours and is not responsible for damage caused by stopping power. The power supply back only proceed after the buyer had paid the full amount, and interest due to late payment, and any costs associated with the stop and power back on
9.2.2. If the seller were compensation and punishment: within 3 days of receiving notification of payment of the seller, buyer power are responsible for paying the full amount of compensation and fines (if any). The term without payment, the buyer must pay the extra power all interest payments deferred payable to the seller. Interest is calculated by the amount of deferred pay multiplied by the interest rate of loans to the Bank's highest seller with the account given in this contract at the time of payment and multiplied by the number on returns, from the date of payment to the buyer your payment, the seller has the right to stop power supply. The seller power would notice the time stopped issuing your first 24 hours and is not responsible for damage caused by stopping power. The power supply back only proceed after the buyer had to pay full compensation, fines, if any, interest due to late payment, and any costs associated with the stop and power back on

Article 10. Other specific agreements
If at the time of purchase and sale of power had occurred in disputes concerning the right to use the premises, land, then the seller has the right unilaterally to stop power (at the request of their premises, land, although the contract of purchase and sale of electricity still validity) that is not responsible for any damage to the buyer by stopping the power supply causeAfter the seller had to notify the buyer power and conducting liquidation contract without bound, buyer power still must pay the full amount power used

Article 11. Dispute Resolution
11.1. the two parties commit to implement, in full the terms stated in this contract
11.2. Cases arising disputes the Parties shall settle by negotiation in the spirit of cooperation but not contrary to law,
11.3. Cases not resolved, within 10 business days from the date of the dispute arises, either party (or parties) may suggest Ownership of industry and trade hosted a mediation; After a period of 15 working days, counting from the date of filing a proposal, the Department of industry and commerce have mediation or conciliation was unsuccessful, either party (or parties) up records and sue in the Court of the County, the district where the electricity is headquartered to solve as required by law

Article 12. Liquidation of the contract
12.1. If the contract is still in the period for which the buyer has written request termination of the Parties to sell electric made to stop providing your right moment requires, at the same time on both sides to conduct liquidation cases treated within 15 days from the date on the sale of electricity to receive notifications.
12.2. the seller your notice to the buyer electronically prior to 15 days before the contract validity period end or on the deadline for renewal of the contract, to the two sides proceed liquidate contracts. Since the expiration duration of the validity of the contract, both sides no agreement signing new contracts or renewal or two sides fulfill the obligation was committed in connection with this agreement, the parties sell electricity made stopping the sale of electricity and of course the contract expired.
12.3. If the buyer and the seller had signed another contract in lieu of this contract, then naturally the contract expired.
12.4. the seller power unilaterally terminate the contract if the buyer power does not use more than 6 months without prior notice to the seller power, except in the case if in paragraph 8.1, article 8 of this agreement

Article 13. The annex attached are integral parts and effect the validity of this contract, including:
-Appendix I: terms agreement specifically
-Appendix II: profiles of engineering and finance related
-Appendix III: method of determining, calculating compensation and punishment,
-The documents and other documents (if any) relating to this contract by the two sides confirmed

Article 14. Duration and validity of the contract
14.1. the duration of this contract starting on … and on …
Unless renewed or terminated ahead of Schedule contract under the terms of the contract.
14.2. modifying and supplementing the contract only effective way: both sides of the agreements signed addendum added or signed a new contract. Appendix additional contracts is an integral part with the contract, in force as the main contract. If the Appendix additional contract terms that contrary to the terms of the contract is considered that provision in the agreement itself was amended.
14.3. this contract continues in force if the two sides have written agreements from time to time. The contract was formed into four copies are worth the same, each party holds one.









ANNEX I,
the TERMS of the AGREEMENT SPECIFICALLY
included in contracts

1. place of use:
2. purpose of use:
3. Points connected electricity: voltage of breaker (CB total) at the substation, grade power: ... kw,
4. Start time: power supply according to hang your design for the first time.
5. voltage: … V
-In normal conditions (… + 5%) kV, defined in the system-level power meter counts the buyer power when the buyer power gain factor (cos) > 0.85 and implement the right of use has been agreed in the contract
-in the event the grid is not stable after crash, voltage deviation allowed from (... + 5%), kV (-10%), kV 5. Frequency: In normal conditions, frequency deviation system allows within + 0.2 Hz compared to the nominal frequency of 50 Hz. cases of incidents, the frequency deviation of + 0.5 Hz
7. the use of follow the chart side loaded with the following basic parameters:
-power using medium on Ptb < … kW
-power use in on < … Pmax kW
-output using smallest on the Pmax < … kW
-output power average: Atb < … kWh per month
-the largest in the peak maximum: Pmaxcđ < … kW
-load dependency graph, or to the agreement: the use of dark peak, the rising level of use; the shift operates electrical equipment under each time accompanied by Annex II to this agreement
8. buyer power regimes use … on:
-Shift 1: From … to …
-Shift 2: From … to …
-Shift 3: From ... to ...
On vacation ... an hour during the week
9. equipment for measuring power counts in accordance with the standards of Vietnam and is the governing body of State authority or organization is authorized under the regulations of the State management of measurement accreditation and sealed. Auditing thereon; thereon, remove the galvanometer is operated by each time be kept attached to this agreement.
9.1. purchase your locations are measured points count 01 electric a. equipment for measuring power: counts etc in the area.
• Power management features: design is the property of the seller, exactly ...
• galvanometer effects – kWh: are the property of the seller, exactly ...
• next protest-kVAR: are the property of the seller, exactly ...
• Transformers voltage (TU): the property of the seller, exactly ... The score (elementary/secondary) ...
• transformers (TI) is the property of the seller, exactly ... The score (elementary/secondary)
• coefficient of electric systems count ...
• the responsibility to protect, manage, ... (System measure count): party ...
b. the parties have a responsibility to protect and manage your accounting, one of the two parties detects galvanometer lost or corrupted, the timely notice to the other side know to solve
9.2. case design (System measure counts) lost or damaged causing loss of power, on the reports to identify the causes and the responsibilities of the parties concerned. If you determine the cause of the fault of the buyer power, the buyer has responsibility for compensation if the seller's fault, the electric power seller is responsible for the repair or replacement of power (power systems count) and continues for to the buyer.
10. grounds of electricity use by the buyer, the seller power would make record index next period/month: Term 1 record date … , Term 2 record date, Term 3 record date … can move recorded before or after 1 day
11. the selling price of electricity,
a. price unity according to the following:
Measuring point Using purpose Code load Rate (%)
or (kWh) Electricity price without VAT (đ/kWh)
Monday to Saturday Sunday
Usual hour Peak hour Off peak hour Usual hour Off peak hour



In which:
In week Time Using electricity time in a day
From moday to Saturday Usual hour From 04 to 09 : 30
From 11 : 30 to 17
From 20 to 22
Peak hour From 09 : 30 to 11 : 30
From 17 to 20
Off peak hour From 22 to 04
Sunday Usual hour From 04 to 22
Off peak hour From 22 to 04


b. the agreement ratio purposes using attached to Appendix II to this agreement;

12. purchasing power resistance: on the sale of electricity to ensure the quality of your recordings at the point of this Appendix 5.6 that buyer power is the capacity of 0.85 (cos) <, then the buyer must purchase electricity capacity. The purchasing power of resistance of buyer power is applied according to the circulars purchasing, resistance capacity 07/2006/TT-BCN on October 27, 2006. The method of payment for purchasing capacity of resistance as the method of payment of your defined in article 3 of this agreement.

13. border property grade power: at what point connected to knives down the electricity supply between the seller and buyer power.

14. Border management works of the seller the buyer power: voltage breaker provides power to the buyer electronically back to the national grid






ANNEX II
TECHNICAL PROFILE and FINANCIAL RELATED
attached contract

Includes:
1. drawing diagrams 1 fiber grid from points connected to the national grid to position connected at the breaker (CB of) the voltage of the buyer, including: schematic layout of ground equipment; Main power scheme;
2. lists devices use power and technical characteristics, equipment or technology of the production line
3. Chart accessories typical load, or the agreement supporting load chart, use the peak hours, the rising level of use; the ca operates electrical equipment under each stage using electricity. 4. The minutes of testing, hang Cao galvanometer and the measurement of the electrical system to measure elapsed in each interval is calibrated according to the law.
5. the agreement ratio of purpose of use.





ANNEX III
METHOD of DETERMINING, CALCULATING COMPENSATION and PUNISHMENT
attached to the contract

1. methods to determine the value of the obligation breached contract due to delay the power supply according to the duration of the agreement on the sale of electrical damage to the buyer power worth the contract obligations are violated as determined by the value of electricity have agreed in the contract and is calculated based on the average registrationtime registration purchase electricity during the day, the price of electricity in the power purchase contracts and the number of days delay is determined by the time pledged to supply electricity to the power supply, according to the following formula:
T = A × g × n
where:
-T: the value of the obligation breached contract (contract)
-A: power on determined pursuant to the registration of the power purchase contracts (average power multiplied by time) is
-g: the price of electricity is now normally (VND/kWh)
-n: number of days delay power supply

2. methods to determine the value of contractual obligations are violated in respect of acts of sale of power does not warrant the quality, not enough power under the agreement (except for unforeseen events) causes damage to buyer power worth the contract obligations are violated as determined by the value of electricity have agreed in the contract and is calculated based on the average capacity, electricity prices stated in the contract of purchase and sale of electricity and electrical sale time does not warrant the quality, not enough power, according to the following:
T = P × g × t
where:
-T: the value of the obligation breached contract (dong)
-P: average capacity registered in the contract buying and selling power (kW)
-g: electric normal hours (VND/kWh)
-t: time selling electric does not warrant the quality, not enough power (hours)

3. methods to determine the value of contractual obligations are violated in respect of acts to delay implementation of the contract signed by buyer power causing damage to the seller
The value of contractual obligations are violated as determined by the value of electricity under the agreement in the contract and shall be calculated pursuant to the registration, the registration period to purchase electricity during the day, the price of electricity in the power purchase contracts and the number of days used touches is determined from the date of agreement to close the power to use the officialby the following formula:
T = A × g × n
where:
-T: the value of the obligation breached contract (contract)
-A: power on determined pursuant to the registration of the contract of purchase and sale of electricity (on average power multiplied by time of use)
-g: Price (VND/kWh)
-n: number of days delay using your

4. method of determining the value of the obligation breached contract for acts exceeding the rate registered on the peak of the chart side of buyer power
The value of the obligation breached Eastern compound are determined by the following formula:
T = A × g
Where:
-T: the value of the contract are violated (dong)
-g: is the selling price of electricity during peak hours according to the tariff regulations of the State authorities during the calculation of compensation (VND/kWh)
-A : the output power during peak hours (kWh) shall be calculated as follows: A to be determined by the capacity during peak hours multiplied by the number of hours on the peak of the violation of the month

5. method of calculation of compensation in case of fraud in the use of
5.1. Power output compensation is determined according to the following formula:
ABT = ASD-AHĐ
where:
ABT: the power to indemnify (kWh)
ASD: the electricity use of appliances consume electricity during breaks (kWh) Of electricity AHĐ: is shown on the invoice payment for electricity during breaks (kWh)
5.2. Compensation (not including VAT) are determined by the following formula:
T = ABT x g
Where:
T: indemnification (dong)
ABT: output power to indemnify (kWh): the price of electricity at the highest level of pricing power by the competent authority determines in accordance with the purpose of using the actual power at the time of discovery of
5.3. Total power usage of the device power consumption shall be determined in accordance with the following formula:
ASD = (P1 x t1 + P2 x t2 + ... + Pi x ti) x n
where:
ASD: Total power used by the device power consumption (kWh)
P1, P2, ...Pi: the capacity used by each device power consumption (kW),
t1, t2, ti: time use for each device (h)
n: number of days calculated compensation (days)

5.4. the use of the device power consumption is the value of the highest capacity is calculated according to one of the following methods:
-the total measured at the time of testing;
-Highest capacity in the chart side load registered in power purchase contracts;
-Capacity of the equipment at the table output device is registered in the contract of purchase and sale of electricity to a total capacity of devices that consume the calls recorded in minutes of checking (can get capacity indicated on the label the equipment home built)

5.5. time use of each device (t) are determined based on the record check;
5.6. the number of days calculated compensation (n) is defined as follows:
-are making violations of discovery;
-Where does not determine the number of days is counted from the date of your most recent check or from the replacement, repair, or check system to measure the count to the nearest power to detect, but not more than twelve months;
-Number of days is except time to stop power and stop using your reason
6. methods of charging electricity during systems count the lost or damaged, or withdrawn or write the next not true or false bills caused by damage to the seller, shall be calculated as the average function calls on the three-cycle records only electronic toll the adjacent earlier multiplied by the number of days actually used. The number of days actually used is calculated from the date of recording the next nearest to your electronic recovery operation

For instance, buyer power does not use your full three-period scoring only electronic toll the adjacent before or haven't used enough three cycle index recording galvanometer, electricity on average is calculated using one or two cycles recorded the previous index plus two or one cycle record index then such that the total number of write cycles of the three

1 comment:

  1. Today, I went to the beach front with my children.
    I found a sea shell and gave it to my 4 year old daughter and said "You can hear the ocean if you put this to your ear." She placed
    the shell to her ear and screamed. There was a hermit crab inside and it pinched
    her ear. She never wants to go back! LoL I know this is completely off topic but I
    had to tell someone!

    Feel free to surf to my website ... cheap payday loans
    Also see my webpage: visit web site

    ReplyDelete